Press release
16.03.2009

Colas wins a 150-million euro design-build contract for a section of highway in Romania

Colas Romania, a subsidiary of Colas in Romania, has just been awarded a design-build contract for a 20-km section of highway between the towns of Cernavodă and Medgidia, with 3 bridges, including an 840-meter long viaduct.

This 150-million euro contract is the final stretch in the southern section of the Paneuropean Corridor IV that links Bucharest to the Black Sea.  

Work is slated to start in the summer of 2009, and will last 24 months.   

With the Suceava bypass in the north, this is the second design-build contract that Colas has won in Romania in less than one year.   

Download the pdf

Delphine Lombard
01 47 61 76 17 - lombard@siege.colas.fr