News

Discover all the technical news of the Colas group

21. 09. 2017

Rodal® for a loading platform on a mining site in New Caledonia

Colas Nouvelle-Calédonie carried out construction work for the dry residue processing pilot plant in the nickel mine from Vale in New Caledonia, including in particular a loading platform.

Colas Nouvelle-Calédonie proposed, for the top layers, a RODAL® percolated asphalt for the wearing course on a class 2 high-modulus-asphalt base course.

This worksite using Rodal® percolated asphalt, a first in this territory, is a showcase that has enabled Colas NouvelleCalédonie to win another contract of this type for an industrial platform in Nouméa.