You are here : Home / Press | Media library / Press releases / Press release
  • initial text size
  • enlarge text x2
  • enlarge text x3

Colas awarded a major design-build civil engineering contract (€40 M) in Romania

 
 

04/15/2008

SCCF Iasi, a subsidiary of Colas in Romania has been awarded a 40-million euro design-build contract for a bypass in the northern Romanian town of Suceava.  
 
In addition to the construction of the 13 km  of roadway for the bypass, the contract also includes the construction of 5 major engineering structures, including two 240-meter long viaducts.    
 
This is the first major civil engineering project for Colas in Romania.  
 
Work is slated to begin in June 2008 and will last 36 months.

Contact

Delphine Lombard
01 47 61 76 17 - lombard@siege.colas.fr